Mission-critical infrastructure threats.


As densities within Data Centers become more concentrated the environments that they are being deployed in are becoming more critical. Not only is power consumption an issue, but ensuring equipment’s optimum performance and longevity are the key to protecting your hardware investment.
Heat, humidity and moisture pose a sever threat to Data Center infrastructure and monitoring these factors goes a long way to minimizing equipment failure and outages while extending equipment life span.
Integrating automatic alerts, video surveillance and logging trends is a proactive exercise that will allow you to make adjustments to the day to day environment and could save you replacement costs due to catastrophic events, such as broken water pipes.
Geist's environmental monitors enable you to keep an eye on remote conditions in critical areas for environmental factors including temperature, humidity, airflow, light, sound, door position, power and much more. And provide alerts for abnormal conditions via Email, SMS & SNMP traps.
Whether you have a single computer room or a multi-location infrastructure, maintaining vigilance over your network could mean the difference between hours of downtime and weeks. Most businesses cannot afford this type of failure and should integrate this type of technology within their disaster recovery policies.
Additional White Papers:
To get a free onsite consultation email eds@datcominc.com or call today 1-800-427-2055

Cutting Cooling Costs.


One of the biggest concerns within the Data Center when it comes to operational costs is cooling. As electricity prices and IT power consumption continue to rise, IT-related energy costs are getting increased scrutiny.
With the adoption of virtualization many organization are experiencing the shrinking Data Center Syndrome. Put simply they are now cooling rooms that are too large for the equipment being housed in them.  
As cooling accounts for approximately 37 percent or more of electricity usage within a  data center having a remedy represents a significant opportunity to reduce IT energy costs.

Here are 5 Strategies for decreasing cooling costs. 

  1. Avoid the mixing of hot and cold air.
  2. Monitoring the environment and automatically adjust the CRAC units.
  3. Ensure efficient return of hot air to HVAC systems.
  4. Unblock raised floors from any impedance.
  5. Segregate unused space under the floor and in the white space.

Together these methods can reduce cooling system energy costs and generate significant, recurring savings.
To get a free onsite consultation email eds@datcominc.com or call today 1-800-427-2055

Benefits of deploying engineered links in the Data Center.


Due to the critical nature of business, many mission critical data center installations are conducted on weekends or evenings to minimize network downtime and disruption. Flexibility and growth are driving factors when it comes to these complex environments which have led to the growing popularity of scalable and modular structured cabling solutions. Pre-terminated cabling systems were designed specifically to accomplish these objectives. 

Here are some of the main benefits when considering RapidNet: 

  • Ensured performance, factory tested
  • Supports both fiber and copper mediums
  • Supports Migration from 1GbE, 10GbE, 40GbE to 100GbE
  • Faster installations, more than 85% faster than traditional field-terminated assemblies
  • Minimized network downtimes and lessened security risks
  • Immediate and continuing return of investment
  • Available as a Zero U Solution
  • Improved cable management and cost-effective work force utilization
  • Flexibility for a variety of applications
  • Easier and more accurate job estimations

RapidNet is a pre-terminated cabling solution that provides data centers with the reliability and flexibility they require to increase density and bandwidth, maximize processing capacity, address space constraints, and reduce operational costs. Suitable applications include: Mission Critical Data Centers, Central Offices, CATV Headends, Enterprise Data Centers, Disaster Recovery, Redundancy Planning, and Temporary Networks.
This pre-terminated, pre-tested solution leaves no excess waste, provides a lower cost of ownership, and minimizes downtime while maintaining reliability.